C.R.Engineering and Technology Co.,Ltd.
The Company provides Consult, Design, Supply,
Install and Maintenance of Electrical,
Automation Control system, Solar power plant
and Pneumatic systems for various enterprises.
C.R.Engineering and Technology Co.,Ltd.
The Company provides Consult, Design, Supply,
Install and Maintenance of Electrical,
Automation Control system, Solar power plant
and Pneumatic systems for various enterprises.
C.R.Engineering and Technology Co.,Ltd.
The Company provides Consult, Design, Supply,
Install and Maintenance of Electrical,
Automation Control system, Solar power plant
and Pneumatic systems for various enterprises.
C.R. Engineering and Technology Co., Ltd.
We provides consultation, design and installation of electrical and automation system for various enterprises such as industrial factory, agriculture in industry and commercial building form small to large both local and asia pacific.
The company is committed to providing excellent service to customers in electrical and automation system with quality standard in accordance the laws, related rules and regulations strictly, in consideration of
- Customer satisfaction.
- Effectiveness and efficiency in operations.
- Human resource development in operation for improved performance.
- Improving operation system and quality management system continuously.
As our experience that the company has accumulated for a long time, we have gained the trust of customers. You can be confident that the company is reliable and can solve any problems for customers until the customer receives the highest satisfaction and is ready to serve all customers with sincerity.
Integrated leectrical system services in the agricultural industry
High Voltage System
Low Voltage System
Electrical Power System For Machines
Factory Automation and Control system (PLC ,SCADA)
Lighting System
Generator System
As our experience that the company has accumulated for a long time, we have gained the trust of customers. You can be confident that the company is reliable and can solve any problems for customers until the customer receives the highest satisfaction and is ready to serve all customers with sincerity
Location | Nakhonratchasima |
Start | January 2019 |
Finish | May 2019 |
Contract | Turn key THB 26.8 Million |
Load | 4,000 kVA |
Man-hours | 42,900MH used 30 people at peak |
Safety incident | LTls : ZERO MTls : ZERO |
Scope | Design supply and installation of
|
Laemthong Agri-Products Co.,Ltd.
Location | Chonburi |
Start | May 2017 |
Finish | October 2017 |
Contract | Turn key THB 28.90 Million |
Load | 3,500 kVA |
Man-hours | 28,800 MH used 30 people at peak |
Safety incident | LTls : ZERO MTls : ZERO |
Scope | Design supply and installation of
|
Panus feed mill Co., Ltd.
Location | Nakhonratchasima |
Start | March 2012 |
Finish | April 2013 |
Contract | Turn key THB 43.25 Million |
Load | 2500 kVA |
Man-hours | 57,600 MH used 30 people at peak |
Safety incident | LTls : ZERO MTls : ZERO |
Scope | Design supply and installation of
|
Cargill Meats (Thailand) Ltd.
Location | Chainat |
Start | August 2015 |
Finish | November 2015 |
Contract | Turn key THB 15.30 Million |
Load 3 | 3,000 kVA |
Man-hours | 19,200MH used 20 people at peak |
Safety incident | LTls : ZERO MTls : ZERO |
Scope | Design supply and installation of
|
Tanasan Rice Co., Ltd.
Location | Chainat |
Start | October 2013 |
Finish | April 2014 |
Contract | Turn key THB 33.59 Million |
Load | 2 x 3000 kVA |
Man-hours | 72,000 MH used 50 people at peak |
Safety incident | LTls : ZERO MTls : ZERO |
Scope | Design supply and installation of
|
Thanakorn ruamphol 999 Co., Ltd
Location | Angthong |
Start | February 2012 |
Finish | May 2012 |
Contract | Turn key THB 14.30 Million |
Load | 630 kVA |
Man-hours | 22,400 MH used 20 people at peak |
Safety incident | LTls : ZERO MTls : ZERO |
Scope | Design supply and installation of
|
Riceland International Co.,Ltd.
Location | Phetchabun |
Start | September 2019 |
Finish | January 2020 |
Load | Turn key THB 12.30 Million |
Load | 500 kVA |
Man-hours | 15,776 MH used for one farm 20 peoples at peak for one farm |
Safety incident | LTls : ZERO MTls : ZERO |
Scope | Design supply and installation of
|
Cargill Meats (Thailand) Ltd.
Location | Phetchabun |
Start | March 2018 |
Finish | May 2018 |
Load | Turn key THB 11.00 Millions |
Load | 630 kVA |
Man-hours | 10,800 MH used for one farm 24 peoples at peak for one farm |
Safety incident | LTls : ZERO MTls : ZERO |
Scope | Design supply and installation of
|
Cargill Meats (Thailand) Ltd.
Location | Phetchabun |
Start | September 2016 |
Finish | January 2017 |
Load | Turn key THB 11.10 Million |
Load | 630 kVA |
Man-hours | 18,432 MH used for one farm 23 peoples at peak for one farm |
Safety incident | LTls : ZERO MTls : ZERO |
Scope | Design supply and installation of High voltage main feeder MDB and Capacitor bank Electrical system for house Power wiring for machines External lighting Control wiring for control devices Lighting system Lightning protection system |
Cargill Meats (Thailand) Ltd.
Location | Ayutthaya |
Start | October 2020 |
Finish | January 2021 |
Load | Turn key THB 1.06 Million |
Load | 60 kVA |
Man-hours | 3,840 MH used 8 people at peak |
Safety incident | LTls : ZERO MTls : ZERO |
Scope | Design supply and installation of
|
Yara Thailand Co., Ltd.
Location | Lamphun |
Start | March 2016 |
Finish | July 2016 |
Load | Turn key THB 13.77 Million |
Load | 350 kVA |
Man-hours | 19,200 MH used 20 people at peak |
Safety incident | LTls : ZERO MTls : ZERO |
Scope | Design supply and installation of
|
Pioneer Hi-Bred (Thailand) Co., Ltd.
Location | Nakhonpathom |
Start | January 2017 |
Finish | April 2017 |
Contract | Turn key THB 6.4 Million |
Load | 250 kVA |
Man-hours | 11,000 MH used 15 people at peak |
Safety incident | LTls : ZERO MTls : ZERO |
Scope | Design supply and installation of
|
Thai Marine Protection Co., Ltd.
Location | Pathum Thani |
Start | July 2009 |
Finish | October 2009 |
Contract | Turn key THB 9.25 Million |
Load | 5000kVA |
Man-hours | 23,000 MH used 30 people at peak |
Safety incident | LTls : ZERO MTls : ZERO |
Scope | Design supply and installation of
|
Eureka Design Co., Ltd.
Location | Chonburi |
Start | July 2008 |
Finish | October 2008 |
Contract | Lump sum THB 9.25 Million |
Load | 55000kVA |
Man-hours | 23,000 MH used 230 people at peak |
Safety incident | LTls : ZERO MTls : ZERO |
Scope | Design supply and installation of
|
Thai NOK Co., Ltd.
Location | Bago Myanmar |
Start | April 2019 |
Finish | November 2019 |
Contract
| Turn key THB 24.13 Million |
Load | 3,500 kVA |
Man-hours | 50,400 MHused 20people at peak |
Safety incident | LTls : ZERO MTls : ZERO |
Scope | Design supply and installation of •Motor control center (MCC) •Power wiring for machines •Automation field wiring •Control wiring for control devices |
Perfect Companion ( Myanmar ) Co.,Ltd.
Location | Indonesia |
Start | December 2017 |
Finish | February 2018 |
Contract | Design and supervision THB 16.60 Million |
Load | 4,000 kVA |
Man-hours | 1,408MH used 4 people for MCC Assembly 2people for supervision |
Safety incident | LTls : ZERO MTls : ZERO |
Scope | Design supply and installation of
|
P.T. Perfect Companion Indonesia
Location | Indonesia |
Start | Febuary 2008 |
Finish | April 2008 |
Contract | Lump sum THB 9.20 Million |
Load | 1000 kVA |
Man-hours | - MH used - people at peak |
Safety incident | LTls : ZERO MTls : ZERO |
Scope | : Design supply and installation of
|
Cargill meats (Indonesia) Co., Ltd.
C.R Engineering and Technology Co.,Ltd.
Has completed Design and Installation of electrical system for the auto packing 40 bins with the outstanding quality and safety performance.
Perfect Companion Group Co., Ltd
C.R Engineering and Technology Co.,Ltd.
Has completed Design and Installation of electrical system for pet food feed mill (Myanmar plant) with the outstanding quality and safety performance.
Perfect Companion Group Co., Ltd
C.R Engineering and Technology Co.,Ltd.
Has completed Design and Installation of electrical system for the extruder line 4 with the outstanding quality and safety performance.
Perfect Companion Group Co., Ltd
C.R Engineering and Technology Co.,Ltd.
Has completed Design, supervision to electrical system and supply motor control center for pet food feed mill ( Indonesia plant ) and Installation of electrical system for the auto with the outstanding quality and safety performance.
Perfect Companion Group Co., Ltd
C.R Engineering and Technology Co.,Ltd.
Has completed Design and Installation of electrical system, PLC & SCADA system for 5 TPH High Grade pet food ( Greatest Pet care Co.,Ltd. / Phra Nakhon Si Ayutthaya ) with the outstanding quality and safety performance.
Ropa Industry Co.,Ltd.
C.R Engineering and Technology Co.,Ltd.
Has completed Design and Installation of electrical system for dryer #8 plant with the outstanding quality and safety performance.
Perfect Companion Group Co., Ltd
C.R Engineering and Technology Co.,Ltd.
Has completed Design and Installation of electrical system for pellet mill line 3 plant with the outstanding quality and safety performance.
JBF Co.,Ltd.
C.R Engineering and Technology Co.,Ltd.
Has completed Design and Installation of electrical system for rice husk mill plant with the outstanding quality and safety performance.
JBF Co.,Ltd.
C.R Engineering and Technology Co.,Ltd.
Has completed Design and Installation of electrical system, PLC & SCADA system for 3 TPH High Grade Pet Food ( SPM Feed Mill Co.,Ltd. / Ratchaburi ) with the outstanding quality and safety performance.
Ropa Industry Co.,Ltd.
C.R Engineering and Technology Co.,Ltd.
Has completed Design and Installation of electrical system for full fat soya plant with the outstanding quality and safety performance.
JBF Co.,Ltd.
C.R Engineering and Technology Co.,Ltd.
finished installing electrical system of Extruder line 5 with the outstanding quality and safety performance.
Perfect Companion Group Co., Ltd
C.R Engineering and Technology Co.,Ltd.
Has finished installing the electrical system of feed mill with the outstanding quality and safety performance.
Cargill Meats (Thailand) Co.,Ltd.
C.R Engineering and Technology Co.,Ltd.
Has finished installing the electrical system of Equine facility with the outstanding quality and safety performance.
Perfect Companion Group Co., Ltd
บริษัท ซี.อาร์. เอนจิเนียริ่ง แอนด์ เทคโนโลยี จำกัด
เป็นผู้ดำเนินการติดตั้งระบบไฟฟ้า โครงการออกแบบและติดตั้งระบบไฟฟ้าสำหรับระบบถังโซโล ข้าวเปลือก 60 ใบ ในปี 2560 โดยติดตั้งงานระบบไฟฟ้า ที่มีคุณภาพ และ ปฏิบัติงานตามกฏระเบียบความปลอดภัยของบริษัทฯ เป็นอย่างดี
บริษัท ล้อพูนผลไรซ์มิลล์ จำกัด
เป็นผู้ดำเนินการติดตั้งระบบไฟฟ้า โครงการออกแบบและติดตั้งระบบไฟฟ้าสำหรับ ปรับปรุงคุณภาพข้าวาร ในปี 2557 โดยติดตั้งงานระบบไฟฟ้า ที่มีคุณภาพ และ ปฏิบัติงานตามกฏระเบียบความปลอดภัยของบริษัทฯ เป็นอย่างดี
บริษัท ไรซ์แลนด์ อินเตอร์เนชั่นแนล จำกัด
เป็นผู้ดำเนินการออกแบบและติดตั้งระบบไฟฟ้า โครงการระบบไฟฟ้าสำหรับระบบถังไซโลและระบบบรรจุข้าวสาร ในปี 2555 โดยติดตั้งงานระบบไฟฟ้า ที่มีคุณภาพ และ ปฏิบัติงานตามกฏระเบียบความปลอดภัยของบริษัทฯ เป็นอย่างดี
บริษัท ไรซ์แลนด์ อินเตอร์เนชั่นแนล จำกัด
เป็นผู้ดำเนินการติดตั้งระบบไฟฟ้า โครงการออกแบบและติดตั้งระบบไฟฟ้าสำหรับโครงการ ปรับปรุงคุณภาพข้าวสาร ในปี 2553 โดยติดตั้งงานระบบไฟฟ้า ที่มีคุณภาพ และ ปฏิบัติงานตามกฏระเบียบความปลอดภัยของบริษัทฯ เป็นอย่างดี
บริษัท ล้อพูนผลไรซ์มิลล์ จำกัด
เป็นผู้ดำเนินการติดตั้งระบบไฟฟ้า โครงการออกแบบและติดตั้งระบบไฟฟ้าสำหรับโรงสีข้าว ในปี 2547 โดยติดตั้งงานระบบไฟฟ้า ที่มีคุณภาพ และ ปฏิบัติงานตามกฏระเบียบความปลอดภัยของบริษัทฯ เป็นอย่างดี
บริษัท ล้อพูนผลไรซ์มิลล์ จำกัด
โครงการ งานปรับปรุงโรงเรือนฟาร์มไก่พ่อแม่พันธุ์ 1
ปฏิบัติงานจนจบโครงการ โดยไม่เกิดอุบัติเหตุจากการทำงาน ( Zero Accident ) รวมชั่วโมงการทำงาน 13,631 ชั่วโมง.
Cargill Meats (Thailand) Co.,Ltd.
Cargill Meats (Thailand) Co.,Ltd.
Cargill Meats (Thailand) Co.,Ltd.
Cargill Meats (Thailand) Co.,Ltd.
Cargill Meats (Thailand) Co.,Ltd.
Cargill Meats (Thailand) Co.,Ltd.
Cargill Meats (Thailand) Co.,Ltd.
Cargill Meats (Thailand) Co.,Ltd.
Thai Marine Protection Co.,Ltd.
Location | Nakhon sawan |
Start | December 2014 |
Finish | February 2015 |
Contract | Turn key THB 12.00 Million |
Load | 2,000 kVA |
Man-hours | 6,400 MH used 10 people at peak |
Safety incident | LTls : ZERO MTls : ZERO |
Scope | Design supply and installation of
|
Seed Asia (Thailand) Co., Ltd.
Location | Samutsakhon |
Start | April 2021 |
Finish | September 2021 |
Contract | Turn key THB 20.70 Million |
Load | 2,500 kVA |
Man-hours | 28,800 MH used 30 people at peak |
Safety incident | LTls : ZERO MTls : ZERO |
Scope | Design supply and installation for
|
Inteqc feed Co., Ltd.
Location | Nakhon Pathom |
Start | January 2021 |
Finish | April 2021 |
Contract | Turn key THB 16.34 Million |
Load | - kVA |
Man-hours | - MH used - people at peak |
Safety incident | LTls : ZERO MTls : ZERO |
Scope | Design supply and installation for
|
Cargill Siam Limited.
Location | Indonesia |
Start | January 2014 |
Finish | February 2014 |
Contract | Turn key THB 9.10 Million |
Load | 250 kVA |
Man-hours | 720 MH used 6 people at peak |
Safety incident | LTls : ZERO MTls : ZERO |
Scope | Design supply and installation for
|
P.T. DuPont Indonesia
Location | Nakhon Ratchasima |
Start | February 2021 |
Finish | April 2021 |
Contract | Turn key THB 9.08 Million |
Load | - kVA |
Man-hours | - MH used - people at peak |
Safety incident | LTls : ZERO MTls : ZERO |
Scope | Design supply and installation for
|
Cargill Siam Limited.
Location | Lamphun |
Start | February 2022 |
Finish | May 2022 |
Contract | Turn key THB 2.94 Million |
Load | - kVA |
Man-hours | - MH used - people at peak |
Safety incident | LTls : ZERO MTls : ZERO |
Scope | Design supply and installation of
|
Corteva Agriscience Lamphun
Location | Phra Nakhon Si Ayutthaya |
Start | June 2022 |
Finish | On going |
Contract | Turn key THB 3.35 Million |
Load | - kVA |
Man-hours | - MH used - people at peak |
Safety incident | LTls : ZERO MTls : ZERO |
Scope | Design supply and installation for
|
ICP International Co,. Ltd.
Location | Lopburi |
Start | February 2021 |
Finish | May 2021 |
Contract | Turn key THB 7.89 Million |
Load | 400 kVA |
Man-hours | - 14,400 MH used for one farm - 24 people at peak |
Safety incident | LTls : ZERO MTls : ZERO |
Scope | Design supply and installation for
|
Cargill meats (Thailand) Limited.
Location | Nakhonpathom |
Start | May 2022 |
Finish | On going |
Contract | Turn key THB 8.80 Million |
Load | 1600 kVA |
Man-hours | - MH used - People at peak |
Safety incident | LTls : ZERO MTls : ZERO |
Scope | Design supply and installation for
|
Thairoongkijkarn Co., Ltd.
Location | Suphanburi |
Start | May 2022 |
Finish | On going |
Contract | Turn key THB 8.20 Million |
Load | 1600 kVA |
Man-hours | - MH used - People at peak |
Safety incident | LTls : ZERO MTls : ZERO |
Scope | Design supply and installation for
|
Thai foods feed mills Co., Ltd.
Location | Nakhon Ratchasima |
Start | January 2022 |
Finish | On going |
Contract | Turn key THB 10.03 Million |
Load | - kVA |
Man-hours | - MH used - People at peak |
Safety incident | LTls : ZERO MTls : ZERO |
Scope | Design supply and installation for
|
Cargill meats (Thailand) Limited.
Location | LAOS |
Start | May 2022 |
Finish | On going |
Contract | Turn key THB 4.02 Million |
Load | 1000 kVA |
Man-hours | - MH used - People at peak |
Safety incident | LTls : ZERO MTls : ZERO |
Scope | Design supply and installation for
|
Bachiang feedmill
Location | Nakhon Pathom |
Start | July 2022 |
Finish | On going |
Contract | Turn key THB 6.58 Million |
Load | 1500 kVA |
Man-hours | - MH used - People at peak |
Safety incident | LTls : ZERO MTls : ZERO |
Scope | Design supply and installation for
|
JBF Co.,Ltd.
Location | Lop buri |
Start | July 2022 |
Finish | On going |
Contract | Turn key THB 16.90 Million |
Load | 800 kVA |
Man-hours | - MH used - People at peak |
Safety incident | LTls : ZERO MTls : ZERO |
Scope | Design supply and installation for
|
The Natural Growth Co., Ltd.
Location | Chachoengsao |
Start | December 2022 |
Finish | On going |
Contract | Turn key THB 10.30 Million |
Load | 1500 kVA |
Man-hours | - MH used - People at peak |
Safety incident | LTls : ZERO MTls : ZERO |
Scope | Design supply and installation for
|
Cargill Siam Limited.
Location | Indonesia |
Start | December 2022 |
Finish | On going |
Contract | Turn key THB 29.54 Million |
Load | 2000 kVA |
Man-hours | - MH used - People at peak |
Safety incident | LTls : ZERO MTls : ZERO |
Scope | Design supply and installation for
|
PT Syngenta Seed Indonesia
Location | Nakhon Ratchasima |
Start | December 2022 |
Finish | On going |
Contract | Turn key THB 5.0 Million |
Load | 160 kVA |
Man-hours | - MH used - People at peak |
Safety incident | LTls : ZERO MTls : ZERO |
Scope | Design supply and installation for
|
Cargill meats (Thailand) Limited